The worker carefully disassembled the stalls, and is reinstalling them.
We are covering the walls with tile to insure that future floods do not cause the same damage.
Preparation of the green-board for tile placement
The pan cupboard is showing corruption, so we will work on the kitchen area next. It is critical that we get it cleaned out.
The kitchen is still functional, but it is critical to our functioning as a home second only to the girl's dorm.
So Far, we have done repairs to the Girl's dorm. We are replacing the sheetrock with green-board. Though we had planned to replace the insulation with foam, it proved to be too expensive. We instead are going for tile as a sealant.